Southern California Edison Turns On Solar In Porterville
A ground-mounted Southern California Edison solar project in the San Joaquin Valley - and one of the largest utility-owned sites in the state - is to be activated today. The impressive display of 29,400 panels is on 32 acres of city land adjacent to the Porterville Municipal Airport.
The panels will generate enough power for 4,300 houses, according to this Fresno Business Journal story from October. Talks of the project first arose as an inquiry more than a year ago and a lease was signed last summer. Here's an earlier story from the Porterville Recorder.
The installation is one of several owned by Edison in California. The panels are mounted and placed at a 25 degree tilt, optimum for this specific location. The utility paid the $18 million cost of the project, which is tied into a nearby distribution circuit.
The installation is one of several owned by Edison in California. The panels are mounted and placed at a 25 degree tilt, optimum for this specific location. The utility paid the $18 million cost of the project, which is tied into a nearby distribution circuit.
Photo by edison.com